Moscow region, Dzerzhinsky city,
5 Alekseevskaya str.
shipping throughout
russia and cis countries

SCAFFOLDING CLAMPS

From Moscow warehouse
Best price guarantee
Double coupler
190 rubles/item
Ex-warehouse delivery
Over 1,000,000 pcs
in stock in Moscow warehouse
Domestic
manufacture
Make a request
ВЫСОТА
Tobolsk Polymer
construction

BEST PRICE IN MARKET

Due to direct delivery from manufacturer
We produce clamps and components directly at the factories in China and India therefore we offer the most affordable prices.
Clamps are designed to join-up scaffolding elements. Clamps are zinc-plated against corrosion. All types of clamps are supplied with clamping nuts and meet the requirements of GOST 24140-80 and international standards BS1139 (1982&1991) and EN74/EN-74B
Years-proven logistics allows to optimize costs and deliver goods from factories in short term.

GOODS

Drop forged double fixed clamp

Available: 116 735 psc.
Weight: 1.025 kg
Drop forged double fixed clamp connect vertical and horizontal scaffolding struts
Modification:
RUB/psc.

Drop forged double swivel clamp

Available: 124 843 psc.
Weight: 1.1 kg
Drop forged double swivel clamp is used to connect diagonal and vertical struts of scaffolding. Rotary clamp allows setting of required angle of beams inclination
Modification:
RUB/psc.

Pipe

Available: 284 ton

This Gas Pipes are used in the construction of scaffolding, all kinds of supports, fences
Modification:
Request Price

Putlog coupler

Available: 88 355 psc.
Weight: 0.6 kg
Putlog coupler is used to fix crossbars at right angle. The Putlog coupler can be used to connect pipes of different diameters.
RUB/psc.
Request Price

Sleeve coupler

Available: 104 782 psc.
Weight: 1.02 kg
Sleeve coupler is used for extension of pipes by means of external connection.
RUB/psc.
Request Price

Beam coupler

Available: 94 214 psc.
Weight: 1.52 kg
This type of construction clamps is used to attach steel girders to wood beams during the construction of beam-girder formwork
RUB/psc.
Request Price

Board retain clamp

Available: 11 432 psc.
Weight: 0.5 kg
Board retain clamp is used to fix to the board
RUB/psc.
Request Price

Ladder coupler

Available: 65 137 psc.
Weight: 0.1 kg
RUB/psc.
Request Price

Clip set (bolt, nut)

Available: 148 500 psc.
Упаковка 500 шт
RUB/psc.
Request Price

Get a personalized offer

At order from 3,000 pcs

LABORATORY TESTED FACTORY QUALITY

Zn
Zinc-plated against corrosion
Conforms to international standards
Interestingly, our scaffolds have been used in construction of Gas Processing Plant on Yamal peninsula
at temperature of -50◦C

WE CAN SHIP YOUR ORDER EVEN TODAY

Inventory stock is sufficient for construction of 3 factories!
Over 1,000,000 pcs
Of clamps and components in stock
1800 tons
Overall weight of inventory reserve

SPECIFICS OF CLAMP SCAFFOLDING

Design of clamp scaffolding

Clamp Scaffolding is made of pipes with diameter of 42 mm to 60 mm, as well as pipe wall thickness of 2 mm. up to 3.5 mm..

Scaffolding clamps are divided into double coupler (blind, non-rotary) and rotary, which differ in their purpose: blind clamps perform a more universal function - connecting vertical and horizontal parts of the structure, whereas rotary clamps are able to connect elements diagonally.

Use of scaffolding clamps

Since the use of tubular clamp scaffolds provides for the mobility of connecting units, it is possible to mount a structure of any configuration with the required height and width of the tier from the composite elements.

This feature is the reason for the range of scaffolds application LSPKh-40 LSPKh-60 - they are indispensable in construction or repair of objects with complex outlines.

Advantages of clamp scaffolding

The main advantage of clamp scaffolding is the ability to work on sites with complex facades.

Possibility to combine with other types of scaffolding - pin-type scaffolding, frame-type scaffolding or wedge-type scaffolding.

Due to the mobility of coupling knots one can assemble the construction of any configuration with folds of required height and width.

Mounting of clamping scaffolding

The LSPKh Stabilized Climbing Scaffolding legs are connected to the lacing, creating a frame structure. This structure is attached to the plugs in the building wall, the lacing is covered with wooden planking in at least three folds due to safety regulations.

Also, to ensure the safety of workers, horizontal barriers are attached using clamps. The rigidity of the LSPKh structure is increased by using diagonal braces.

TECHNICAL CHARACTERISTICS CLAMP SCAFFOLDING

brand Max. scaffolding depth for building facades Max. depth of masonry wall scaffolding Fold pitch for the building facade Tier pitch for construction of mansory wall Frame pitch along the wall for construction of building exteriors Frame pitch along masonry wall Allowable surface load for finishing work Allowable surface load for masonry construction
ЛСПХ-40 40 м 20 м 2 м 1 м 2,5 м 1,5 м 200 Па (kgс/м2) 250 Па (kgс/м2)
ЛСПХ-40 60 м 40 м 2 м 1 м 2,5 м 1,6 м 200 Па (kgс/м2) 250 Па (kgс/м2)

THE MAJOR PROJECTS
ARE INTRUSTED TO US

Construction of Amur Gas Processing Plant

in city Svobodny
GAZPROM
Scaffolding clamps and components delivery in 2018

Construction of Industrial Complex “Tobolsk Polymer”

in Tobolsk city
SIBUR
Scaffolding clamps and components delivery in 2018

Construction of Industrial Complex “Yamal LNG”

an Yamal peninsula
NOVATEK
Scaffolding clamps and components delivery in 2018

Construction of Industrial Complex “Arctic LNG-2”

in Murmansk city
NOVATEK
Scaffolding clamps and components delivery in 2019-2021

Yamal-Europe pipeline construction

GAZPROM
Scaffolding clamps and components delivery in 2019

Kharampur Oil and Gas Condensate Deposit field development

RUSFEN
Larssen sheet piles and workable timber delivery in 2020-2021

OUR PARTNERS

APPRECIATION
LETTERS

NEED ADVICE?

Natalia Stepanova
Construction Equipment Specialist
Get advice
on Scaffolding Clamps
How would you like us to call you?
Contact number

CONTACTS

Warehouse
Moscow region, Dzerzhinsky city, 5 Alekseevskaya str.
9 am – 6 pm Moscow time
Office
Ufa city, 15/1 Sorge str.
9 am – 6 pm Moscow time
8-800-700-54-13
i89177955508
visota1300@mail.ru
usr3@mail.ru
+7 347 246 49 42
+7 917 795 55 08
+7 917 795 16 06
+7 917 807 29 13